Zafiro Homes – Block B
17/11/2026·Paulo Santos
Work carried out
Hot-melt membrane applied to podium bay 3, reinforcement sheet installed.
Supervisor observations
Good progress, site tidy, all PPE in use. No incidents to report.
Demo dataEntries · last 14 days
27
Weather downtime
14 h
Sites reporting
6
Weather data supports, but does not replace, the supervisor's observations.
17/11/2026·Paulo Santos
Work carried out
Hot-melt membrane applied to podium bay 3, reinforcement sheet installed.
Supervisor observations
Good progress, site tidy, all PPE in use. No incidents to report.
17/11/2026·Paulo Santos
Work carried out
Flood test on completed area – no leaks observed.
Supervisor observations
Good progress, site tidy, all PPE in use. No incidents to report.
16/11/2026·Daniel Okafor
Work carried out
Hot-melt membrane applied to podium bay 3, reinforcement sheet installed.
Supervisor observations
Work suspended because of strong winds – gusts on podium edge felt well above comfortable levels; materials secured.
16/11/2026·Daniel Okafor
Work carried out
Flood test on completed area – no leaks observed.
Supervisor observations
Good progress, site tidy, all PPE in use. No incidents to report.
14/11/2026·Paulo Santos
Work carried out
Flood test on completed area – no leaks observed.
Supervisor observations
Roofing work delayed due to heavy rain. Deck too wet to prime until early afternoon.
14/11/2026·Paulo Santos
Work carried out
Stripped existing felt, inspected deck boards, replaced two rotten sheets.
Supervisor observations
Good progress, site tidy, all PPE in use. No incidents to report.
13/11/2026·Marcus Reid
Work carried out
Installed walkway tiles and edge trims on terrace level 2.
Supervisor observations
Reduced productivity caused by adverse weather – intermittent showers, worked under temporary cover.
13/11/2026·Daniel Okafor
Work carried out
Flood test on completed area – no leaks observed.
Supervisor observations
Good progress, site tidy, all PPE in use. No incidents to report.
13/11/2026·Daniel Okafor
Work carried out
Stripped existing felt, inspected deck boards, replaced two rotten sheets.
Supervisor observations
Good progress, site tidy, all PPE in use. No incidents to report.
12/11/2026·Marcus Reid
Work carried out
Flood test on completed area – no leaks observed.
Supervisor observations
Good progress, site tidy, all PPE in use. No incidents to report.
12/11/2026·Marcus Reid
Work carried out
Stripped existing felt, inspected deck boards, replaced two rotten sheets.
Supervisor observations
Good progress, site tidy, all PPE in use. No incidents to report.
11/11/2026·Paulo Santos
Work carried out
Stripped existing felt, inspected deck boards, replaced two rotten sheets.
Supervisor observations
Good progress, site tidy, all PPE in use. No incidents to report.
11/11/2026·Paulo Santos
Work carried out
Installed walkway tiles and edge trims on terrace level 2.
Supervisor observations
Good progress, site tidy, all PPE in use. No incidents to report.
10/11/2026·Daniel Okafor
Work carried out
Stripped existing felt, inspected deck boards, replaced two rotten sheets.
Supervisor observations
Good progress, site tidy, all PPE in use. No incidents to report.
10/11/2026·Marcus Reid
Work carried out
Fixed new battens and laid slates to east elevation.
Supervisor observations
Frost on deck at 07:30; start delayed until surface dried and was safe to walk.
10/11/2026·Daniel Okafor
Work carried out
Installed walkway tiles and edge trims on terrace level 2.
Supervisor observations
Good progress, site tidy, all PPE in use. No incidents to report.
09/11/2026·Marcus Reid
Work carried out
Stripped existing felt, inspected deck boards, replaced two rotten sheets.
Supervisor observations
Good progress, site tidy, all PPE in use. No incidents to report.
09/11/2026·Marcus Reid
Work carried out
Installed walkway tiles and edge trims on terrace level 2.
Supervisor observations
Good progress, site tidy, all PPE in use. No incidents to report.
07/11/2026·Daniel Okafor
Work carried out
Installed walkway tiles and edge trims on terrace level 2.
Supervisor observations
Good progress, site tidy, all PPE in use. No incidents to report.
07/11/2026·Daniel Okafor
Work carried out
Torched-on cap sheet to rear flat roof; dressed upstands and outlets.
Supervisor observations
Good progress, site tidy, all PPE in use. No incidents to report.
06/11/2026·Marcus Reid
Work carried out
Installed walkway tiles and edge trims on terrace level 2.
Supervisor observations
Good progress, site tidy, all PPE in use. No incidents to report.
06/11/2026·Marcus Reid
Work carried out
Torched-on cap sheet to rear flat roof; dressed upstands and outlets.
Supervisor observations
Good progress, site tidy, all PPE in use. No incidents to report.
06/11/2026·Daniel Okafor
Work carried out
Stripped existing felt, inspected deck boards, replaced two rotten sheets.
Supervisor observations
Reduced productivity caused by adverse weather – gusty conditions slowed slate handling at height.
05/11/2026·Paulo Santos
Work carried out
Torched-on cap sheet to rear flat roof; dressed upstands and outlets.
Supervisor observations
Good progress, site tidy, all PPE in use. No incidents to report.
05/11/2026·Paulo Santos
Work carried out
Fixed new battens and laid slates to east elevation.
Supervisor observations
Good progress, site tidy, all PPE in use. No incidents to report.
04/11/2026·Daniel Okafor
Work carried out
Torched-on cap sheet to rear flat roof; dressed upstands and outlets.
Supervisor observations
Good progress, site tidy, all PPE in use. No incidents to report.
04/11/2026·Daniel Okafor
Work carried out
Fixed new battens and laid slates to east elevation.
Supervisor observations
Good progress, site tidy, all PPE in use. No incidents to report.